top of page

US Embassy

2010

 

During the US Embassy Entrance reconstruction our scope of work involved the removal of the original exterior granite entrance stone and the design and build of a new steel framework attached to wrap around the concrete structure on which the new and reused granite wall pieces were to be anchored. The perimeter walls and piers were removed and reinstated along with new Indiana Limestone panels installed on the interior.

bottom of page